One of the largest electricity production facilities in Ireland engaged Climeaction to support continued regulatory compliance as well as the next phase of their decarbonisation strategy across their Ireland campus of sites.
The client’s operation in Ireland produces approximately 20% of the total electricity in the energy grid through natural gas combustion and steam to electrical generators, with an annual energy consumption exceeding 5,220 GWh.
This client is a major part of the critical infrastructure of Ireland and without it there would be huge disruptions to the national electricity grid, affecting millions of people. There is a significant house load of nearly 12 MW which covers all auxiliary equipment required to operation the two generators onsite. The challenge with this site is in the development of opportunities that will not affect the site operation nor provide any potential future risks going forward.
Climeaction conducted an SI426 energy audit in 2022, integrating data across all major energy systems to identify significant users, load profiles, and reduction pathways. The audit uncovered potential annual cost savings of nearly €8 million, equating to 136 GWh in energy savings.